MULLER-BBM MEMBER LOGIN
계정 문의 info@paksystem.co.kr
CONTACT MULLER-BBM
Name :
Company :
E-mail :
Phone :
Title :
Contents :
CONTACT
Fields > Plant engineering > Turbines
Turbines

Creation of energy by use of turbines

Every power station operator is reliant on turbines that operate at maximum efficiency.

One crucial aspect is to inspect and monitor the turbines during operation. This is where the PAK MKII system takes over. It records structure-borne sound levels and Wheatstone bridge readings as well as the quantities relevant to turbines at different operating points. Whether for permanent monitoring or recording vibrations caused by dedicated special constructions – PAK supports operators with its online capability.

Phase-synchronized Data Recordings

For regular maintenance, the mobile PAK MKII system with its high-resolution tacho input offers the data basis for the PAK "Dynamic Balancing" application. The measurement systems can be decentralized situated and offer phase-synchronized data recordings for large structures, whereby signal cables are reduced to a minimum.

· 서울특별시 서초구 바우뫼로27길 7-11(양재동70-2) 대송빌딩 3층 뮐러비비엠코리아(주)
· 전화번호: 02.529.0375~6 · 팩스번호: 02.529.0378 · E-mail: info@paksystem.co.kr